DripDrop
Big frenly fren. Much wow!
...city council voted in support...
City council commits to Veterans Crosswalk in downtown Salmon Arm - Salmon Arm Observer
Two year pilot program approved
saobserver.net
(Previous episodes: https://freecanada.win/threads/35761/)...“this will be a two-year pilot program.”
The new report included updated costs – $9,500 for the initial crosswalk install with regular paint, and $4,500 for annual maintenance.
Using methyl methacrylate, the same material used to paint the downtown Pride Crosswalk, the estimate was $30,000-plus to install, with repaints costing $10,000 each.
...it’s going to need more than one touch up, one repaint… a year...
Upvote
4